• Engineering case
      Home  >  Engineering case  >  Details
    • Zhejiang Chung Fu STP Retrofitting Project
    • Background

      Chongfu STP originally used SBR process with a total scale of 30,000 m3/d, facing difficulties consist of expanding the scale to 60,000m3/d,high content of refractory organic matter, large proportion of printing and dyeing, tannery wastewater, strong water quality impact , and shark fluctuation. The effluent need to implement I-A standard in this retrofitting.

      Implementation Idea

      secondary sedimentation tank is built and IFAS is implemented in A2/O to replace the original SBR process, which improve nitrification and denitrification without increasing the tank capacity. 

      Highlight

      Strong impact load resistance to water quality, quantity and toxic substances.

      Expansion without extra tank construction.

      浙江崇福污水处理厂

Copyright © 2025 Qingdao Spring Water-treatment Co.,Ltd. All Rights Reserved