
-
-
-
Engineering Case
-
-
-
Urat Jieyuan WTP originally used Carrousel 2000 oxidation ditch with total scale of 10,000 m3/d, the effluent implemented I-B standard. In 2013, to solve the problems that the effluent COD and ammonia nitrogen exceeded standard in winter, the trans for mation in low-temperature is carried out. The effluent implements I-A standard.
-
-
Chongfu STP originally used SBR process with a total scale of 30,000 m3/d, facing difficulties consist of expanding the scale to 60,000m3/d,high content of refractory organic matter, large proportion of printing and dyeing, tannery wastewater, strong water quality impact , and shark fluctuation. The effluent need to implement I-A standard in this retrofitting.
-
共有8条信息 -
- LINKS
Copyright © 2025 Qingdao Spring Water-treatment Co.,Ltd. All Rights Reserved